Integrated Preparation System for Oral Liquid Production

Tanlet provides integrated preparation systems for oral liquid production, covering material preparation, dissolving, mixing, filtration, sterilization, transfer and cleaning.

 

System Overview

 

 

The system configuration is established around the formulation process, production capacity, material characteristics and required operating conditions.
Preparation tanks, mixing equipment, filtration, transfer, sterilization and cleaning systems are integrated into one coordinated production system.

 

 
Process Flow
 

Raw Material Preparation → Dissolving → Mixing → Filtration → Sterilization → Transfer → Cleaning
The process sequence connects each preparation stage with the required equipment and control functions.

01/

Preparation and Transfer
Preparation tanks and transfer equipment handle raw material charging, dissolution, mixing and movement between process stages.
Tank capacity, agitation, heating or cooling and transfer requirements are coordinated with the production process.

02/

Filtration and Sterilization
Filtration equipment removes unwanted particles from the prepared liquid before downstream processing.
Sterilization equipment and process controls are integrated according to the required production conditions.

03/

CIP/SIP
Cleaning and sterilization systems are connected with the process equipment and piping.
Automated cleaning and sterilization sequences support equipment preparation between production cycles.

04/

Automation
PLC/DCS control integrates tanks, pumps, valves, instruments and process sequences.
Temperature, level, flow and other defined process parameters are monitored through the control system.

05/

Main Equipment
The system may incorporate preparation tanks, mixing tanks, storage tanks, filters, pumps, heat exchangers, sterilization equipment, valves, instruments and CIP/SIP equipment according to the process configuration.

06/

Project Delivery
Tanlet coordinates equipment manufacturing, piping and system integration, factory testing, site installation and commissioning for the complete preparation system.